Project management software allows you to plan projects easily, assign tasks according to the team’s workload, keep track of meeting the set timelines, minimize employee overload, and meet deadlines. There are a vast number of applications and services on the market today that can be used to configure and manage various processes. Finding and selecting a project management solution that will meet the specific needs of your business can be challenging. In this article, we will explore the most popular and well-known solutions on the market to help you make the right decision and choose a solution that suits your team’s needs.

With adequately selected and customized software, you can not only establish a unified environment for project management but also handle a range of other tasks, such as:

  • Collaboration and communication;
  • Company resource management;
  • Task tracking and time management;
  • Analysis and reporting.

By customizing solutions to fit specific business processes, a company can automate a significant portion of routine tasks and improve efficiency, productivity, and collaboration within teams to complete projects on time.

Top 27 Best Project Management Software in 2026

Project management software helps structure work on tasks and projects, organizes the work of all participants in a uniform information environment, and automates business processes. With many solutions on the market, how do you choose the one that best suits your business? In this overview, we examine the main strengths and weaknesses, features, and pricing to help you select the best project management system that meets your company’s needs.

1. Planfix

Planfix is a project management system and, simultaneously, a constructor that can be customized and configured for tasks and projects of any scale. Owing to its flexibility, Planfix is suitable for small teams or startups, as well as for serving as a unified management system for large companies, bringing all teams together in one information environment.

Employee workload planner in Planfix

Source: https://planfix.com/

Key Planfix Features

Planfix’s range of functions covers all project management tasks, enabling work on projects of all kinds, both IT and non-IT:

  • Planners: Whiteboard, Calendar, Schedule, Table, Kanban, Chronicle;
  • Various task views: Gantt chart, table, tree, Chronicle, location;
  • Workspaces: ability to create separate workspaces for different departments, teams, and external users;
  • Automation: automatic creation, modification, or completion of projects and tasks based on triggers or scripts configured by you, including scheduled reports;
  • Testing mode: Test any configured business process automation before implementation. The system reports inconsistencies and identifies errors, if any;
  • Logging: reports on user activities in tasks and projects, prevents data leaks;
  • Robots: a tool for automating business processes, notifications, and much more;
  • Document management: Allows for use of both internal storage and connect external ones. Create templates, work with documents online and on a computer;
  • Working with email: Connect a corporate email, create virtual addresses within the account, use internal email addresses for tasks and projects.

Planfix Integrations

Planfix offers pre-made integrations with many popular programs and services. Developers can use the Planfix API to develop their integrations and connect their services:

  • Messengers and social media: Facebook, Instagram, WhatsApp, Telegram, Viber.
  • Email and email marketing services: MailChimp, SendPulse, Twilio, Plivo, Vonage, TextUs, SimpleTexting.
  • Programs for working with documents: Google Docs, Google Sheets, Microsoft Word and Excel, Microsoft 365.
  • Cloud Storage: Google Drive, OneDrive, Dropbox.
  • Connector Apps: Make, Zapier.
  • Virtual PBX.

Planfix Advantages

Among Planfix functions for efficient teamwork on tasks and projects are:

  • Flexible role management: advanced functions for editing access to tasks and projects, ability to grant access to unregistered users.
  • Customer support: communicate directly from your account or via a convenient channel, such as email, social media, or messenger.
  • Calculated task fields and dynamic blocks: ability to use project data—allows you to edit a large amount of information from different objects in one window.
  • Bulk actions for projects and tasks: Make changes to any number of objects with just a few clicks. For example, add a new auditor to all projects or replace a highly complex task assignee with another one.
  • Launching reports from projects: The system automatically generates the desired report directly from projects data tags, limiting the data used for the report to the specific project from which the report is initiated.
  • Comment visibility settings: You can configure the visibility of comments so that customers only see work comments on tasks they have been notified about. This setting allows employees to communicate within tasks without concern that customers will see the conversation between them.
  • Omnichannel capability: Receive messages via email and messengers and communicate directly in one system.
  • Ready-made solutions: preconfigured templates for automating various business processes, such as project and task management, increasing team productivity, reporting, etc.

Planfix Cons:

  • Limited number of projects and project templates in the free version.
  • Configuring the system may appear complicated for beginners due to large range of features.

Planfix Cost and Free Version

Despite certain functional limitations, the free version is suitable for managing projects for small teams and start-ups.

  • Free – $0 up to 5 users
  • Plan A – $8
  • Plan B – $18
  • Plan X – $28

2. Jira

Jira Software is one of the leading providers in IT project management. A wide range of integrations, plugins, and tools enable the customization of centralized project management at any complexity for development teams, startups, and IT companies of any size.

Product roadmap in Jira

Source: https://www.atlassian.com/software/jira/

Key Jira Features

The key features that make teamwork on projects more efficient include:

  • Customizable workflows;
  • Backlog;
  • Dependency management;
  • Reporting and insights.

Jira Integrations

Jira offers an extensive list of integrations with various programs, including for design, marketing, IT, and development teams, such as Slack, GitHub, HubSpot, TogglTrack, Figma, Loom, Sentry, G Suite, Dropbox, Clockify, and others.

Jira Pros and Cons

Jira Pros:

  • In addition to its numerous integrations, Jira has a dedicated plugin marketplace.
  • Unlimited access to Jira Work Management.
  • Intuitive automation setup.
  • A comprehensive approach to managing development processes.
  • Well-suited for IT projects.

Jira Cons:

  • Limited features in the free version.
  • Beginners may find the user interface overloaded and unintuitive.
  • Configuration requires in-depth system knowledge.
  • User activity logging is only available in the Enterprise version.
  • Non-IT teams may have difficulty familiarizing themselves with it.

Jira Cost and Free Version

The free version is rather limited in functionality and more suitable for managing individual projects.

  • Free – $0 up to 10 users
  • Standard – $8.15
  • Premium – $16
  • Enterprise – prices available upon request

3. Asana

Despite the high cost of upgrades, Asana has gained popularity among users thanks to its intuitive user interface and comprehensive collaboration tools. It’s one of the few services available for free for teams of up to 10 people.

Task list website redesign in Asana

Source: https://asana.com/

Key Asana Features

Asana offers various features for project management automation, including:

  • Asana Intelligence: smart fields, statuses, answers etc.;
  • Views: list, board, calendar, Gantt, timeline;
  • Task rules and automation;
  • Unlimited tasks and projects;
  • Multi-home tasks to projects;
  • Global custom fields.

Asana integrations

Some of Asana’s integrations include popular software products such as Microsoft Teams, Gmail, Slack, Zoom, Vimeo, Google Drive, and Trello.

Asana Pros and Cons

Asana Pros:

  • The free version supports up to 10 users but has limited automation capabilities.
  • User-friendly with drag-and-drop functionality.
  • No limit to the number of projects or tasks that can be created.
  • Ability to create customized reports.

Asana Cons:

  • Time tracking is only available with the Advanced plan.
  • Limited administration capabilities.
  • Lack of 24/7 support.
  • Limited file size for attachments.
  • Advanced reports are not available on the basic pricing plans.

Asana Cost and Free Version

The free version is designed for up to 10 users with no limit on the number of projects.

  • Personal – $0 up to 10 users
  • Starter – $10.99 up to 500 users
  • Advanced – $24.99 up to 500 users
  • Enterprise – prices available upon request

 4. Wrike

Wrike’s features are suitable for task and project management and collaboration among teams of different sizes, provided you have the budget, as this product is costly. Its extensive features can also present some onboarding challenges.

Wrike OKR table with progress tracking

Source: https://www.wrike.com/

Key Wrike Features

Among the functions for teamwork on tasks and projects, we can highlight:

  • Task priorities;
  • Custom work views (Table view, Kanban, Calendars, Dynamic Gantt chart);
  • Time tracking;
  • Work Intelligence®;
  • Project dashboards and planners;
  • Automation;
  • Resource Management.

 Wrike integrations

Wrike’s integrations include email services, document processing software, Google and Microsoft services, Zoom, Slack, and more.

Wrike Pros and Cons

Wrike Pros:

  • Flexible management of tasks and subtasks.
  • Various display options: Gantt chart, calendar, boards.
  • Pre-made project templates by category.
  • AI availability for automating specific processes.

Wrike Cons:

  • Small internal storage capacity.
  • Limited account management capabilities.
  • Lack of two-factor authentication.
  • Time tracking is not available in all packages.

Wrike Cost and Free Version

The free version is suitable for task management or managing small projects

  • Free – $0
  • Team – $9.80 from 3 users
  • Business – $24.80 from 5 users
  • Enterprise – prices available upon request
  • Pinnacle – prices available upon request

5. ClickUp

This is a software solution for collaborative tasks, projects, and enterprise resource management. It is suitable for both teams working remotely and in a hybrid format.

ClickUp sprint board with grouped tasks

Source: https://app.clickup.com/

Key ClickUp Features

ClickUp offers a variety of features for task and project management, including:

  • Time-tracking and Timesheets;
  • Various views: Gantt chart, Kanban board, Mind Maps;
  • Custom fields;
  • Goals;
  • Tags and Priorities.

ClickUp Integrations

The list of pre-built integrations with ClickUp is not extensive. ClickUp offers integrations with GitHub, GitLab, HubSpot, cloud storage solutions, Figma, Zoom, and others. For services not directly available, you can establish data exchange via the Zapier connector.

ClickUp Pros and Cons

ClickUp Pros:

  • Advanced free plan compared to similar services.
  • Unlimited internal storage in all pricing plans.
  • Guest access and customizable permissions on all levels except the free plan.
  • Customization options for fields, statuses, and more.

ClickUp Cons:

  • Slow data updates on dashboards.
  • Regular issues when testing connectors.
  • Lack of security settings (only available in the Enterprise package).
  • Limited time tracking functions.

ClickUp Cost and Free Version

In terms of functionality, the free version of ClickUp is suitable for personal use, such as for freelancers managing projects, as well as for small teams.

  • Free – $0
  • Unlimited – $7
  • Business – $12
  • Enterprise – prices available upon request.

6. Monday.com

Monday.com is suitable for project management across diverse teams, including marketing, product, IT, and others. Although the software solution offers a wide range of project tracking tools for managing business processes, its configuration options for system security are minimal.

Leads table grouped by status in Monday

Source: https://monday.com/

Key Monday.com Features

Among the features that help increase team productivity in collaborative tasks within projects are:

  • Business process automation tools;
  • Various views (Gantt chart, Timeline, Kanban, Calendar);
  • Customized notifications;
  • Dashboards that consolidate multiple project boards;
  • Time tracking (available with the Pro subscription).

Monday.com Integrations

The integrations available with the Monday.com service include programs and solutions for communication and collaboration between marketing and IT teams: Slack, Gmail, Microsoft Teams, GitLab, Mailchimp, Excel, Outlook, DocuSign, and more.

Monday.com Pros and Cons

Monday.com Pros:

  • Easily configurable and customizable interface.
  • A large collection of pre-made templates.
  • Different field types and the ability to create custom fields.

Monday.com Cons:

  • Users report regular issues with updates.
  • Very limited trial version with limitations for up to two users.
  • Access for external users (read-only users) is not available in the basic subscription plans.
  • Small internal file storage capacity.
  • Limited retention period for activity logs.

Monday.com Cost and Free Version

Monday.com has a free version, but it is limited in its functionality and only available for teams of up to two people (up to two seats).

  • Free – $0
  • Basic – $8
  • Standard – $10
  • Pro – $16
  • Enterprise – prices available upon request
  • At least three seats are required in all paid plans.

7. Zoho Projects

Zoho Projects is well-suited for small teams managing tasks and projects, as well as for companies that use other Zoho products. By using Zoho’s software solutions, you can unify the work of all teams within a single information environment. It’s important to note that each product is licensed separately.

Construction Kanban task board in Zoho Projects

Source: https://www.zoho.com/projects/

Key Zoho Projects Features

Among the functional features that help optimize project management within a company are:

  • In-depth analytics with customizable reports;
  • Built-in time tracking;
  • Integrated document management systems;
  • Risk management;
  • Gantt chart;
  • Project Custom Status and Tags.

Zoho Projects Integrations

In addition to integrations with third-party programs and services such as Google and Microsoft services, email services, and calendars, Zoho also integrates with its other programs such as Zoho CRM, Zoho People, Zoho Desk, and others.

 Zoho Projects Pros and Cons

 Zoho Pros:

  • Extensive integrations with Zoho products (licensed separately).
  • Built-in time tracker and time management.
  • Comprehensive task and project analytics.
  • Extensive automation functions for business processes.

 Zoho Cons:

  • The Gantt chart for projects is only available in the highest price plan.
  • Custom fields in tasks and projects are only available in the highest pricing plan.
  • Access for external users (Read-only users) comes at an additional cost and is only available with the highest price plan.
  • Limited trial period – 10 days.

Zoho Projects Cost and Free Version

The free version has limited functionality and is available for up to 3 users. Zoho also offers a trial version, but it’s limited to 10 days.

  • Free – €0
  • Premium – €5
  • Enterprise – €10

8. Teamwork

Users rate Teamwork as a platform with an intuitive and pleasant user interface. The service offers a whole range of functions for task and project management. Training courses and an extensive collection of reference materials are available for learning.

Teamwork project health dashboard overview

Source: https://www.teamwork.com/

Key Teamwork Features

The main functional features for teamwork on tasks and projects include:

  • Time tracking and timesheet;
  • Templates;
  • Automation: fixed actions per month;
  • Gantt chart;
  • Team chat;
  • Notifications.

Teamwork Integrations

Teamwork’s website features integrations developed by its own team as well as third-party integrations, including HubSpot, Slack, MS Teams, Parallax, Google services, etc.

Teamwork Pros and Cons

Teamwork Pros:

  • Desktop application.
  • Invoicing functions.
  • Internal storage from 50 GB for paid plans.

Teamwork Cons:

  • Limitations on custom fields.
  • Lack of PDF or image markup tools.
  • Lack of modification logging in the basic plans.
  • Limited options for creating reports.

Teamwork Cost and Free Version

Teamwork offers a free plan for teams of up to 5 people. In terms of functionality, it is suitable for personal use, such as managing individual projects, or for small start-ups just beginning to set up their business processes.

  • Free – $0 up to 5 users
  • Starter – $5.99 from 3 users
  • Deliver – $9.99 from 3 users
  • Grow – $19.99 from 5 users

9. Basecamp

Basecamp suits small and medium-sized teams, especially those willing to work with an out-of-the-box product. Users looking for a customizable solution that suits their needs may encounter discomfort due to the lack of flexible settings.

Basecamp programmer cases Kanban board

Source: https://basecamp.com/

Key Basecamp Features

This project management software program offers a wide range of functions for task and project management. Among the key offerings are:

  • Hill Charts – a tool for tracking the project life cycle;
  • Chats – for exchanging messages and news with colleagues;
  • Internal storage – for storing documents related to your projects;
  • Project tracking tools for automating teamwork.

Basecamp Integrations

The list of available services for integration includes programs for developers, marketing, customer support, analytics, and reporting services.

Basecamp Pros and Cons

Basecamp Pros:

  • Suitable for small companies.
  • Pre-made templates and dashboards.
  • Ability to set different access rights for the team and external users.

Basecamp Cons:

  • Users consider the main weakness to be that the product is no longer keeping up with the state of the art.
  • Lack of flexibility and limited customization options for processes and workspaces.
  • Absence of a free version.

Basecamp Cost and Free Version

Basecamp does not offer a free version of the product. The pricing options consist of two levels for small teams or startups and larger teams. The unique feature of the latter is a fixed monthly payment for an unlimited number of users.

  • Basecamp – $15
  • Basecamp pro unlimited – $299

10. Smartsheet

This is an easy-to-configure tool with powerful features for project automation. Beginners can use pre-made templates to create their team’s work processes.

Smartsheet project intake spreadsheet view

Source: https://www.smartsheet.com/

Key Smartsheet Features

Functional features for project activities:

  • Creating custom work processes;
  • Working with formulas and field customization;
  • Different types of views: Gantt grid, table, calendar;
  • Templates for reports, scenarios, and documents;
  • Resource management.

Smartsheet Integrations

Among Smartsheet’s integrations are services for communication, content and document creation, as well as security solutions: Slack, MS Teams, Power BI, Adobe Creative Cloud Integration, McAfee, MS Defender for Cloud Apps, etc.

Smartsheet Pros and Cons

Smartsheet Pros:

  • A wide range of optimization tools is already available with the free plan.
  • Formulas and calculated fields for handling various data and creating reports.
  • Ready-made templates not only for documents but also for business processes.
  • Mobile app.

Smartsheet Cons:

  • Revisions are not automatically updated, which does not guarantee data accuracy.
  • Integrations with third-party services are somewhat unpolished and may not fully meet users’ needs.
  • Limited customization and formatting options for tables, charts, and reports.
  • Many integrations are only available on the Enterprise plan or must be purchased separately.

Smartsheet Cost and Free Version

The free version of Smartsheet is suitable for personal use in managing individual tasks and projects.

  • Free – $0 up to 1 user
  • Pro – $7 up to 10 users
  • Business – $7 from 3 users
  • Enterprise – prices available upon request

11. Zenkit

Zenkit is an adaptable project management tool that offers a range of features to help teams organize and manage their work effectively.

Zenkit office admin task list

Source: https://zenkit.com/en/

Key Zenkit Features

Zenkit offers a variety of features for task and project management, including:

  • Multiple views: Kanban, table, calendar, mind map, and Gantt chart;
  • Collaboration tools: real-time collaboration, comments, and file sharing;
  • Task management: subtasks, checklists, and dependencies;
  • Custom fields and labels;
  • Integrations with various third-party applications.

Zenkit Integrations

Integrations are mostly available through the Zapir service, but Zenkit also offers to connect third-party applications via API.

Zenkit Pros and Cons

Pros

  • Multiple views to suit different project management styles.
  • Real-time collaboration features.
  • Bulk actions available.

Cons

  • Some advanced features are only available in higher-tier plans.
  • Outdated design and not always intuitive interface. 
  • Learning curve due to the variety of features.

Zenkit Cost and Free Version

Zenkit offers a free plan with limited features for individuals and personal projects:

  • Personal – free, for personal use only 
  • Plus – $8 
  • Business – $21
  • Enterprise – Custom pricing available upon request.

12. Notion

Notion is an all-in-one workspace that combines notes, tasks, databases, and calendars, allowing teams to collaborate seamlessly.

Notion content calendar

Source: https://www.notion.com/

Key Notion Features

Notion offers an array of functionalities to support task and project management, such as:

  • Notes and documents with rich formatting;
  • Databases and tables;
  • Kanban boards, calendars, and list views;
  • Templates for various use cases;
  • Real-time collaboration.

Notion Integrations

The list of available services for integration includes programs for Dev team, marketing team, finances, sales, and design team. Notion integrates with tools like Slack, Google Drive, GitHub, Figma, OneDrive and Zapier.

Notion Pros and Cons

Pros

  • Highly customizable workspace.
  • Combines multiple tools into one platform.
  • User-friendly interface.
  • Free for personal use.

Cons

  • Limited offline access.
  • No built-in time tracking features.
  • Users don’t find the mobile version intuitive or user-friendly.
  • Some advanced features require a learning curve.

Notion Cost and Free Version

Notion offers a free version for personal use and several paid trier plans:

  • Free – $0 for individual projects and personal use
  • Plus – $10 
  • Business– $15 
  • Enterprise – Custom pricing available upon request.

13. ProofHub

ProofHub is a project management and team collaboration software that brings together all the tools teams need to plan, collaborate, and deliver projects on time.

ProofHub projects table

Source: https://www.proofhub.com/

Key ProofHub Features

ProofHub includes diverse features designed to streamline project management and collaboration, including:

  • Task management with workflows and boards;
  • Time tracking;
  • Discussions and chats for team communication;
  • File sharing and document management;
  • Reporting and project analytics.

ProofHub Integrations

ProofHub integrates with apps like Google Drive, Dropbox, OneDrive, and Box.

ProofHub Pros and Cons

Pros

  • Flat pricing regardless of the number of users.
  • User-friendly interface.
  • Comprehensive set of project management tools.

Cons

  • Limited third-party integrations compared to competitors.
  • No free plan available.

ProofHub Cost and Free Version

ProofHub does not offer a free version.

  • Essential – $45 per month (billed annually)
  • Ultimate Control – $89 per month (billed annually).

14. TeamGantt

TeamGantt is a project planning tool that makes it easy to create and manage Gantt charts for project scheduling.

TeamGantt marketing project Gantt chart

Source: https://www.teamgantt.com/

Key TeamGantt Features

TeamGantt is equipped with numerous tools for efficient task and project management, such as:

  • Drag-and-drop Gantt chart creation;
  • Task dependencies;
  • Team collaboration with comments and file attachments;
  • Workload and availability tracking;
  • Project templates.

TeamGantt Integrations

TeamGantt integrates with tools like Trello, Slack, and Basecamp.

TeamGantt Pros and Cons

Pros

  • Intuitive and user-friendly interface.
  • Focused on Gantt chart project planning.
  • Collaboration features included.

Cons

  • Limited features outside of Gantt chart planning.
  • Higher-tier plans can be expensive for larger teams.

TeamGantt Cost and Free Version

TeamGantt offers a free plan for students and small projects with limited features.

  • Free – $0 for 1 manager and 2 collaborators
  • Pro – $49
  • Unlimited Everything – custom pricing available upon request.

15. Hive

Hive is a productivity platform designed to help teams work faster and more efficiently by providing project management, collaboration, and analytics tools.

Hive marketing portfolio project overview

Source: https://hive.com/

Key Hive Features

The main functional features for teamwork on tasks and projects include:

  • Project layouts: Kanban, Gantt, calendar, and table views;
  • Messaging and email integration;
  • Time tracking and resourcing;
  • Automation and templates;
  • Analytics and reporting.

Hive Integrations

Hive integrates with tools like Slack, Zoom, Google Drive, and Salesforce.

Hive Pros and Cons

Pros

  • Multiple project views.
  • Support is included in all pricing plans.
  • Projects chat and messaging.
  • AI free.

Cons

  • Can be complex for new users.
  • Some features require additional costs.
  • Customization is not available on the basic pricing plans and requires additional costs on higher plans.
  • Only pre-configured workflows and automation is available.

Hive Cost and Free Version

Hive offers a free version with limited functionality for self projects or simple task management.

  • Free – $0 
  • Starter – $5
  • Teams – $12
  • Enterprise – prices available upon request.

16. Workzone

Workzone is a solution for comprehensive project management at all stages – from planning and budgeting to tracking results and collecting reports.

Project list with progress tracking in Workzone

Source: https://www.workzone.com/

Key Workzone Features

Workzone provides a wide range of tools for collaborative work on tasks and projects, such as:

  • Project dashboards;
  • To-do lists;
  • Gantt charts;
  • Project templates;
  • Time tracking;
  • Resource management;
  • File sharing and review.

Workzone Integrations

Workzone integrations cover various areas including accounting, file sharing, communication, marketing, CRM, and time tracking. Examples include Google Drive, Slack, Hubspot, Zoho Books, MS Teams, Salesforce, Github, Harvest, Toggl, and many more.

Workzone Pros and Cons

Pros

  • User-friendly interface with intuitive navigation.
  • Comprehensive project tracking and reporting features.
  • PM training and support are included in all plans.
  • Change management support.

Cons

  • Interface can feel cluttered for new users.
  • Limited customization options.
  • Pricing may be higher compared to some competitors.
  • Some advanced features are available only in higher-tier plans.

Workzone Cost and Free Version

Workzone does not offer a free version of the product. The pricing options consist of three-tiered pricing models to accommodate different team sizes and project needs:

  • Team – $24 from 5 users
  • Professional – $34
  • Enterprise – $45.

17. Microsoft Project

Microsoft Project is a comprehensive project management software developed by Microsoft, designed to assist project managers in planning, executing, and overseeing projects efficiently.

Microsoft Teams project grid with tasks

Source: https://www.microsoft.com/en-us/microsoft-365/project/project-management-software/

Key Microsoft Project Features

Microsoft Project delivers comprehensive features to enhance task and project management, including:

  • Boards and views: Gantt Charts, grid view,board view.
  • Resource management and allocation;
  • Project and budgeting tracking;
  • Team communication and document sharing.
  • Reporting and analytics;
  • Integration with Microsoft Ecosystem.

Microsoft Project Integrations

Microsoft Project – a powerful enterprise solution integrates seamlessly with various tools within the Microsoft ecosystem, including Microsoft 365, Microsoft Copilot Studio, and Outlook, enhancing its functionality and providing a cohesive user experience.

Microsoft Project Pros and Cons

Pros

  • Comprehensive feature set for projects of any complexity and scale.
  • Seamless integration with other Microsoft products, providing a unified business environment.
  • Familiar Interface: Users acquainted with Microsoft Office may find the interface intuitive.

Cons

  • The extensive features can be overwhelming for new users.
  • Higher price point compared to some competitors, which may be a consideration for small and medium businesses.
  • May be more complex than necessary for simple project management needs.

Microsoft Project Cost and Free Version

Microsoft Project offers several pricing plans, both cloud-based and desktop:

  • Free – Basic Planner is included in Microsoft 365 Enterprise plans.
  • Project Plan 1 – $10
  • Project Plan 3 – $30
  • Project Plan 5 – $55

On-premises versions: One-time purchase options are available, with Project Standard 2024 priced at $679.99 and Project Professional 2024 at $1,129.99.

18. Airtable

Airtable is a software solution for integrated project management that includes CRM system functions, financial management and team collaboration.

Airtable CRM client database

Source: https://www.airtable.com/

Key Airtable Features

  • Various views: Grid, calendar, Kanban, gallery, and form views;
  • Collaborative Workspaces for real-time collaboration;
  • Automation and customizable workflows;
  • Client and lead management;
  • Tracking changes and revision history.

Airtable Integrations

Airtable integrates with various tools to enhance productivity, including Slack, Google Drive, Trello, Jira,  and more.

Airtable Pros and Cons

Pros

  • User-friendly interface.
  • Adaptivity and customization.
  • Multiple Views: Offers various ways to visualize data, catering to different preferences.

Cons

  • May encounter performance challenges with very large datasets.
  • Costs can escalate with the addition of more users and advanced features.
  • Some complex project management functionalities may be lacking.

Airtable Cost and Free Version

Airtable offers several pricing plans:

  • Free – $0 up to 5 editors
  • Team – $20 
  • Business – $45 
  • Enterprise Scale: Custom pricing; tailored for large organizations with advanced security and administrative needs.

19. Adobe Workfront

Adobe Workfront is a cloud-based enterprise work management solution designed to connect strategy to delivery, integrating people and data across the company.

Adobe Workfront marketing Kanban board

Source: https://business.adobe.com/products/workfront.html/

Key Adobe Workfront Features

  • Project and portfolio management;
  • Resource management;
  • Task management;
  • Time tracking;
  • Reporting and analytics;
  • Customizable dashboards.

Adobe Workfront Integrations

Adobe Workfront integrates with various Adobe products and third-party applications, including Adobe Creative Cloud, Adobe Experience Manager, Microsoft Teams, Slack, and more.

Adobe Workfront Pros and Cons

Pros

  • Comprehensive work management features.
  • Seamless integration with Adobe products.
  • Customizable to fit various workflows.
  • Strong reporting and analytics capabilities.

Cons

  • Can be complex to implement and learn.
  • Higher cost compared to some competitors.
  • Performance can be slow with large data sets.

Adobe Workfront Cost and Free Version

Adobe Workfront does not offer a free version. Pricing is available upon request and varies based on the organization’s needs. The cost per user per month ranges from $49 to $99.

20. Toggl Plan

Toggl Plan is a project management tool designed to help teams plan and visualize their work using intuitive timelines and task boards.

Toggl Plan weekly time calendar

Source: https://toggl.com/plan/index/

Key Toggl Plan Features

  • Visual timelines for tasks and projects;
  • Task management features;
  • Deadlines management;
  • Team collaboration;
  • Workload management.

Toggl Plan Integrations

Toggl Plan integrates with various tools to enhance productivity, including Slack, Google Calendar, and more.

Toggl Plan Pros and Cons

Pros

  • Simple and intuitive interface suitable for small teams and freelancers.
  • Clear visualization of project timelines and tasks.
  • Affordable pricing.

Cons

  • Limited advanced features for complex project management.
  • No version history or logging history.
  • Does not allow multiple assignments.
  • No time tracking.
  • Resource management requires purchasing additional users.

Toggl Plan Cost and Free Version

Toggl Plan offers several pricing plans including a free version suitable for solo users and small teams:

  • Free – $0 up to 5 users
  • Capacity – $5, additionally $3 per ghost user
  • Starter – Starting at $8, additionally $3 per ghost user
  • Premium – $13.5, additionally $3 per ghost user

For teams planning to use Toggl Plan for resource management, it is important to note that each active resource is billed separately and referred to as a “ghost user.” Accordingly, this should be taken into account when budgeting for the software solution.

21. Celoxis

Celoxis is built for advanced project and portfolio management, helping teams plan complex workflows, allocate resources, and track budgets across multiple projects. Its feature depth makes it a strong fit for structured operations, though onboarding may take time.

Project tracking budget in Celoxis

Source: https://www.celoxis.com/

Key Celoxis Features

  • Advanced project planning and scheduling,
  • Resource and workload management,
  • Budgeting and cost tracking,
  • Custom dashboards and reporting,
  • Automation and workflow management.

Celoxis Integrations

  • Integration with Microsoft Teams,
  • Integration with Slack,
  • Integration with Google Workspace,
  • Integration with Zapier,
  • Integration with REST API.

Celoxis Pros and Cons

Pros

  • Powerful resource management.
  • Advanced reporting capabilities.
  • Strong project planning tools.
  • Good for portfolio management.
  • Highly customizable workflows.

Cons

  • Interface can feel outdated.
  • Steep learning curve.
  • Overkill for small teams.
  • Limited ease of use.
  • Requires setup time.

Celoxis Costs and Free Version

  • No free plan
  • Cloud – from $25/user/monthOn-premise – custom pricing

22. ActiveCollab

ActiveCollab is designed for teams managing client work, combining task management, time tracking, and billing in one platform. It offers a good balance of simplicity and functionality, though it lacks deeper enterprise features.

ActiveCollab project cards

Source: https://activecollab.com/

Key ActiveCollab Features

  • Task and project management,
  • Time tracking and invoicing,
  • Team collaboration and communication,
  • File sharing and document management,
  • Project templates and automation.

ActiveCollab Integrations

  • Integration with Slack,
  • Integration with Zapier,
  • Integration with Google Drive,
  • Integration with QuickBooks,
  • Integration with API.

ActiveCollab Pros and Cons

Pros

  • Easy to use interface.
  • Built-in time tracking and billing.
  • Good for agency workflows.
  • Affordable pricing.
  • Quick onboarding.

Cons

  • Limited advanced features.
  • Basic reporting tools.
  • Fewer integrations than competitors.
  • Limited scalability.
  • Not ideal for enterprise use.

ActiveCollab Costs and Free Version

Pro – from $14/user/month

Free – $0 (limited features)

Plus – from $9/user/month

23. Paymo

Paymo is built for small teams and freelancers who need project management combined with time tracking and invoicing. It simplifies billing and workload tracking but lacks depth for larger organizations.

Paymo generic project task board

Source: https://www.paymoapp.com/

Key Paymo Features

  • Task and project tracking,
  • Time tracking and timesheets,
  • Invoicing and expense tracking,
  • Team collaboration tools,
  • Gantt charts and scheduling.

Paymo Integrations

  • Integration with Slack,
  • Integration with Google Workspace,
  • Integration with Zapier,
  • Integration with QuickBooks,
  • Integration with API.

Paymo  Pros and Cons

Pros

  • Strong time tracking features.
  • Built-in invoicing.
  • Good for freelancers.
  • Clean interface.
  • Affordable pricing.

Cons

  • Limited advanced automation.
  • Not suitable for large teams.
  • Fewer integrations.
  • Basic reporting.
  • Limited customization.

Paymo Costs and Free Version

Business – from $16.9/user/month

24. Freedcamp

Freedcamp focuses on providing essential project management features with a generous free plan, making it accessible for small teams. It is flexible but lacks the polish and advanced capabilities of more mature platforms.

Gantt chart in Freedcamp

Source: https://freedcamp.com/

Key Freedcamp Features

  • Task lists and Kanban boards,
  • Time tracking and calendar view,
  • File sharing and document management,
  • Issue tracking and discussions,
  • Customizable workflows.

Freedcamp Integrations

  • Integration with Google Drive,
  • Integration with Dropbox,
  • Integration with Zapier,
  • Integration with API,
  • Integration with email tools.

Freedcamp Pros and Cons

Pros

  • Generous free plan.
  • Easy to get started.
  • Flexible feature set.
  • Good for small teams.
  • Wide range of modules.

Cons

  • Interface is less modern.
  • Limited advanced features.
  • Performance issues with large projects.
  • Fewer integrations.
  • Basic reporting tools.

Freedcamp Costs and Free Version

  • Free – $0
  • Pro – from $1.49/user/month
  • Business – from $7.49/user/month
  • Enterprise – custom pricing

25. Scoro

Scoro combines project management with financial and business management tools, making it a comprehensive solution for service-based companies. Its broad functionality is powerful but can feel complex for smaller teams.

Scoro CEO dashboard with sales pipeline

Source: https://www.scoro.com/

Key Scoro Features

  • Project and task management,
  • Time tracking and billing,
  • Resource planning and scheduling,
  • Financial management and reporting,
  • Automation and dashboards.

Scoro Integrations

  • Integration with Slack,
  • Integration with Google Workspace,
  • Integration with QuickBooks,
  • Integration with Zapier,
  • Integration with API.

Scoro Pros and Cons

Pros

  • All-in-one business management tool.
  • Strong financial features.
  • Good resource planning tools.
  • Suitable for agencies.
  • Scales well with growth.

Cons

  • Higher pricing.
  • Complex setup.
  • Learning curve.
  • Overkill for small teams.
  • Interface can feel heavy.

Scoro Costs and Free Version

  • No free plan
  • Essential – from $26/user/month
  • Standard – from $37/user/month
  • Pro – from $63/user/month

26. Miro

Miro is a visual collaboration platform that helps teams plan, brainstorm, and manage projects in a shared workspace. It excels in ideation and alignment but is less focused on structured task management.

Leadership mind map in Miro

Source: https://miro.com/

Key Miro Features

  • Infinite whiteboard for planning and brainstorming,
  • Ready-made templates for workflows and roadmaps,
  • Real-time collaboration with comments and mentions,
  • Integration with project management and communication tools,
  • Support for Agile workflows and product development.

Miro Integrations

  • Integration with Slack,
  • Integration with Microsoft Teams,
  • Integration with Jira,
  • Integration with Google Workspace,
  • Integration with API.

Miro Pros and Cons

Pros

  • Excellent for visual collaboration.
  • Easy to onboard teams.
  • Strong template library.
  • Works well for remote teams.
  • Flexible use beyond project management.

Cons

  • Not a traditional task-based PM tool.
  • Limited task tracking features.
  • Can become cluttered with large boards.
  • Requires structure for scalability.
  • Pricing grows with team size.

Miro Costs and Free Version

  • Free – $0 (limited boards and features)
  • Starter – from $8/user/month
  • Business – from $16/user/month
  • Enterprise – custom pricing

27. Nifty

Nifty is an all-in-one project management platform that combines task tracking, collaboration, and progress monitoring. It offers a balanced feature set but may lack depth for highly complex enterprise workflows.

Nifty mobile app roadmap milestones

Source: https://niftypm.com/

Key Nifty Features

  • Task and milestone tracking,
  • Project timelines and roadmaps,
  • Team collaboration and discussions,
  • Document sharing and file storage,
  • Automation and workflow management.

Nifty Integrations

  • Integration with Slack,
  • Integration with Google Workspace,
  • Integration with Zapier,
  • Integration with GitHub,
  • Integration with API.

Nifty  Pros and Cons

Pros

  • All-in-one workspace.
  • Clean and modern interface.
  • Easy to track project progress.
  • Good balance of features and simplicity.
  • Suitable for remote teams.

Cons

  • Limited advanced customization.
  • Smaller ecosystem of integrations.
  • Reporting tools are basic.
  • Not ideal for enterprise use.
  • Performance may slow with large projects.

Nifty Costs and Free Version

  • Free – $0 (limited projects)
  • Starter – from $5/user/month
  • Pro – from $10/user/month
  • Business – from $16/user/month


What to Look for in Project Management Software?

Free – $0 (limited features)

Starter – from $5.9/user/month

Small Office – from $10.9/user/month

There can be no universal advice here; the choice of a set of system functionalities will depend solely on your organization’s needs. However, a modern project management system should include the following tools and functions:

  • Flexible task and project management tools.
  • Storage and sharing of documents within the system.
  • Tools for automating business processes.
  • Integration with third-party services and applications.
  • Platform customization and workspace configuration for each team.
  • Communication options: internal chat, email integration, external chat, IP telephony.
  • Time management, team workload management, and time tracking capabilities.

How To Choose the Best Project Management Tool?

To get a really helpful tool for managing projects and making teamwork easier, make sure the solution meets what you need and fits your budget. We’ve gathered important things to look out for.

Trial Period

No description of functional benefits can match the experience of using the product. Without trying the product, it is unlikely that you will see how well it fits your requirements and tasks. Please note that not all providers offer a 30-day trial period; some provide a 14-day trial period.

Availability of a Free Version of the Product

For small teams and start-ups, the availability of a free version of the product is of great importance. This is an excellent opportunity to get started without a significant financial investment. By organizing business processes at the beginning of the project, the company can scale its information environment as it grows and later move to a paid plan.

Pricing

We recommend carefully reviewing the provider’s pricing plans and licensing when deciding on a solution. To create a budget, you should understand how the final cost is determined: whether there is a one-time fee, whether support is free or charged separately, and whether all necessary features are included in the price of the package or must be purchased separately.

Onboarding and Training

Many solution providers offer help centers and free training courses for administrators and users. Also, look out for the availability of training videos that can make the onboarding process easier for your colleagues.

Customer Support

Pay attention to the availability of customer support and its cost, as support can be charged separately. Consider which communication channels are available: email-only, or chat and messaging? Is 24/7 support available, or is it only accessible during business hours and on working days? Is support offered in your language?

Reviews from Existing Users

If unsure whether a solution suits you, we recommend reading customer reviews on review platforms. This will tell you how satisfied users are with the system and what challenges users typically face.

FAQ about Project Management Tools

What Is the Best Project Management Software for Small Businesses?

For small businesses, the best project management software should offer features like task tracking, collaboration tools, time tracking, and budget management. Some of the best online project management tools – Asana, Trello, Monday.com and Planfix, which are user-friendly, scalable, and offer customizable workflows to suit the needs of small teams. These top rated project management software solutions facilitate efficient project planning, communication, and task execution, making them ideal choices for small business project management.

What are the Three Main Types of Project Management Software?

The three main types of project management software are Traditional Project Management Software, Agile Project Management Software, and Hybrid Project Management Software. Traditional Project Management Software tools follow a sequential approach, with tasks and activities organized linearly. Agile Project Management Software is designed for iterative and adaptive project management, these tools focus on collaboration, flexibility, and continuous improvement. Hybrid Project Management Software combines aspects of traditional and agile methodologies, hybrid tools offer flexibility in project planning and execution.

What Are the Benefits of Project Management Software?

Project management software offers numerous benefits, including streamlined communication, centralized project data, task organization, and collaboration tools. It improves productivity, ensures deadlines are met, and enhances project visibility. Additionally, project management software facilitates resource allocation, budget tracking, and risk management, leading to more efficient project execution and successful outcomes.

Why Is Project Management Important?

Project management is crucial as it ensures projects are completed on time, within budget, and with the desired quality. It involves planning, organizing, and overseeing tasks, resources, and timelines to achieve project goals effectively. Project management enhances communication, reduces risks, optimizes resource allocation, and fosters collaboration, leading to successful project outcomes and satisfied stakeholders.

Conclusion

We recommend trying a trial version to decide which software solution best suits your company and fits your business processes.

Planfix offers a full-featured trial version of the product for 14 days. Why not give it a try right now?

Feel free to contact our support team if you have any questions about how the system works or need assistance with the setup process. They are always ready to help.

Share article

Comments 2

  1. Alexis R. Ware February 27, 2025

    I explored your blog on Best Project Management Software in 2025—thank you for the detailed breakdown! Your insights into Planfix’s flexibility and automation capabilities were particularly helpful in understanding its potential for both small teams and large enterprises.

    While investigating, I came across this resource on AI in Project Management Software: https://mobisoftinfotech.com/resources/blog/ai-requirements-management-software-development . It discusses how AI is enhancing project management through automated task allocation, predictive analytics, and smarter decision-making.

    Do you think AI-driven automation will become a standard feature in project management tools, or will human intervention always be essential for certain tasks? Looking forward to your thoughts!

    1. Aliona T February 27, 2025

      Hello, Alexis R. Ware

      AI-driven automation is rapidly becoming a standard feature in project management tools, transforming how teams handle routine operations. In Planfix, for example, businesses can automate task assignments, deadline tracking, and approval processes—freeing up valuable time for strategic work. With a comprehensive set of automation features, Planfix allows companies to configure workflows that adapt to their unique processes, ensuring efficiency without rigid constraints.

      However, human intervention remains essential for decision-making, creative problem-solving, and handling unpredictable challenges. While AI can streamline operations, project goals, strategic planning, and relationship management still require a human touch. The future of project management likely lies in a hybrid model, where AI handles routine tasks while people focus on high-value activities.

Leave a comment

You might also like