Widget
A widget visualizes a metric in the Planner and helps keep key indicators in view, such as a sales plan, team workload, or number of overdue tasks.
A Planner made up of widgets is called a dashboard.
How to add a widget
- Open the Planner.
- In the menu for adding a list, select "Widget".
- Complete the three steps in the wizard: visualization type, data type, and details and settings.
- Click "Save".
The widget will appear in the Planner as a regular list. To change the settings of an existing widget, open the same window by selecting "Edit" in the widget menu.
Visualization type
| Type | What it shows | Best suited for |
|---|---|---|
| Pie chart | Distribution by category or plan completion percentage, with the chart shown as a full circle | When the dashboard is viewed on a large screen and visual clarity is important |
| Donut chart | Same as a pie chart, but with an open center | When the dashboard contains many blocks and a more compact chart is needed |
| Number | A value displayed in large text; for plan and actual data, it also shows the completion percentage | When the exact value matters, such as revenue, budget, or number of deals |
See the page for each visualization type for details on its settings.
Data type
- Summary metrics — the widget displays a single value: the number of tasks, contacts, or projects; a sum for a selected field; or a breakdown of data by segments.
- Plan and actual — the widget displays the planned and actual values for a metric and calculates the plan completion percentage.
Details and settings
The available settings depend on the visualization type and data type, but the general logic is the same.
Data source
- System — the widget calculates data for tasks, contacts, or projects. Set up the selection criteria in the same way as a task filter. This is suitable for anything already digitized in the system, such as overdue tasks, team workload, or project statuses.
- Enter manually — a user enters the values. This is useful when a metric is outside the system and retrieving it via API is not cost-effective, such as expenses from different ad accounts, revenue from several cash registers, or warehouse balances.
Calculation rules
For values calculated by the system, specify:
- What data to display — tasks, contacts, or projects.
- What to calculate — the number of entries or the sum of values in a selected field.
- Selection parameters — project, status, supervisor, period, and any other available filter parameters.
Data entry permissions
For values entered manually, you can configure editing permissions:
- No one — only an administrator can change the values (default).
- All employees — any user can edit the values.
- Select — specify a particular employee or group.
Updating data
- Values calculated by the system are recalculated based on the latest data in Planfix. Refresh the page to see the latest figures on the dashboard.