Date: Difference between revisions
From Planfix
(→Go To) |
No edit summary |
||
Line 6: | Line 6: | ||
}} | }} | ||
This type of field stores dates. The standard Planfix interface for selecting dates is used when working with this type of field.You can create a ''' Date''' field as a [[Custom fields|custom field]], a [[Directories|directory field]], or a [[Data Tags|data tag]] field. | This type of field stores dates. The standard Planfix interface for selecting dates is used when working with this type of field.You can create a ''' Date''' field as a [[Custom fields|custom field]], a [[Directories|directory field]], or a [[Data Tags|data tag]] field. | ||
Example of a '''Date''' field: | Example of a '''Date''' field: | ||
https://s.pfx.so/pf/7W/y7K1ya.jpg | https://s.pfx.so/pf/7W/y7K1ya.jpg | ||
==Field Parameters:== | ==Field Parameters:== |
Revision as of 08:32, 24 September 2024
This type of field stores dates. The standard Planfix interface for selecting dates is used when working with this type of field.You can create a Date field as a custom field, a directory field, or a data tag field.
Example of a Date field:
Field Parameters:
No duplication — this option will not allow saving the field value if it already exists for this field in another task/contact. Automatically fill in current date — allows the field to be filled with the current date when creating a task.
Parameters for this type of field in directories:
- Display as hyperlink — turns the value entered into the field into an active hyperlink.
- Mandatory field — prevents saving the directory entry until this field has a value.
Parameters for this type of field in data tags:
- Wrap the heading — allows long headers to be wrapped onto a new line.