Time management: Difference between revisions

From Planfix
Jump to: navigation, search
No edit summary
No edit summary
 
(11 intermediate revisions by the same user not shown)
Line 1: Line 1:
<pre>
{{#seo:
The translation of this page is done using machine translation technology.  
|title=Time management
We apologize for any inaccuracies and errors.
|titlemode=append
</pre>
|keywords=planfix, Time management, data tags
|description=Time management
}}
Planfix offers multiple ways to track time, including options that do not require data tags. The system includes standard time-tracking data tags, a widely used time-tracking approach. However, their use is not mandatory.


Analytics group "Time Management" contains two dimensions:
The [[Data Tags|data tag]] group "Time management" contains two types of data tags:
*Planned working time  
*'''Planned work time'''
*Actual working time (for the configuration [[Time tracking]])
*'''Actual working time''' (for the [[Time-Tracking: Working & Leisure Time]] solution)




Analytics '''Planned working time''' is usually attached to the task automatically whenever you are planning to work on it, see the [[Planner]]. It contains information about the date and time on which the scheduled job. In addition to the system functions for which it was created, this Analytics can also be used in reports to compare planned and actual time spent on the task.
The '''Planned work time''' data tag is available by default in every Planfix account and stores information about the date and time range scheduled for a task. It includes the following fields:


https://s.pfx.so/pf/wZ/pnOktf.jpg


Analytics '''Actual working time''' is usually attached to the task by the officer who creates an action with a description of the steps taken on the task of work. It contains information about the date, time and type of work that was actually conducted in this period. This Analytics is the basis for calculating hourly wages. To view the results of the work reflected through this dimension, it is possible in standard report [[Report: time tracking]]
Standard use of this data tag:
*In [[Planner]] lists of the [[Hourly calendar]] type, the '''Planned work time''' data tag is displayed as a calendar booking block for the specified employee during the defined period.
*Panfix automatically adds the '''Planned work time''' data tag to tasks for which you have specified an employee and set a start time and a due date (within the same day). It then displays these tasks in Planfix’s standard hourly calendars.
*In addition to the system functions, this data tag can be used in reports to compare the planned time with the actual time spent on a task.


The '''Actual working time''' data tag is usually attached to a task by an employee who creates an action that describes the work performed. It contains information about the date, the period, and the type of work performed during this period:


https://s.pfx.so/pf/Vl/eaSgOs.jpg
In the standard [[Time-Tracking: Working & Leisure Time|Time-tracking]] solution, this data tag is used to calculate hourly wages. It can also compare planned versus actual work time in hourly tracking.
==Note==
When synchronizing with Google Calendar, the following time transfer rules apply:
*If you use the [[Full calendar]], task, and data tag dates are transferred, meaning two events will be created in Google Calendar.
*If you use the [[Hourly calendar]], only data tag dates are transferred, meaning a single event will be created in Google Calendar.
== Useful ==
== Useful ==
* New accounts to work with Analytics "Actual working time" need to install the configuration of the [[Time tracking]]
*New accounts must install the [[Time-Tracking: Working & Leisure Time|Time-tracking]] solution to be able to use the Actual working time data tag.
*[[Timer|The timer is now part of Planfix]]
*[[Timer in the Mobile App]]




== Go To ==
== Go To ==
*[[Data Tags]]
*[[Data Tags]]

Latest revision as of 13:29, 30 January 2025

Planfix offers multiple ways to track time, including options that do not require data tags. The system includes standard time-tracking data tags, a widely used time-tracking approach. However, their use is not mandatory.

The data tag group "Time management" contains two types of data tags:


The Planned work time data tag is available by default in every Planfix account and stores information about the date and time range scheduled for a task. It includes the following fields:

pnOktf.jpg

Standard use of this data tag:

  • In Planner lists of the Hourly calendar type, the Planned work time data tag is displayed as a calendar booking block for the specified employee during the defined period.
  • Panfix automatically adds the Planned work time data tag to tasks for which you have specified an employee and set a start time and a due date (within the same day). It then displays these tasks in Planfix’s standard hourly calendars.
  • In addition to the system functions, this data tag can be used in reports to compare the planned time with the actual time spent on a task.

The Actual working time data tag is usually attached to a task by an employee who creates an action that describes the work performed. It contains information about the date, the period, and the type of work performed during this period:

eaSgOs.jpg

In the standard Time-tracking solution, this data tag is used to calculate hourly wages. It can also compare planned versus actual work time in hourly tracking.

Note

When synchronizing with Google Calendar, the following time transfer rules apply:

  • If you use the Full calendar, task, and data tag dates are transferred, meaning two events will be created in Google Calendar.
  • If you use the Hourly calendar, only data tag dates are transferred, meaning a single event will be created in Google Calendar.

Useful


Go To