Time management: Difference between revisions

From Planfix
Jump to: navigation, search
No edit summary
No edit summary
Line 21: Line 21:
*In addition to the system functions, this data tag can be used in reports to compare the planned time with the actual time spent on a task.
*In addition to the system functions, this data tag can be used in reports to compare the planned time with the actual time spent on a task.


The '''Actual working time''' data tag is usually attached to a task by an employee who creates an action that describes the work performed. It contains information about the date, the period, and the type of work performed during this period:


Analytics '''Actual working time''' is usually attached to the task by the officer who creates an action with a description of the steps taken on the task of work. It contains information about the date, time and type of work that was actually conducted in this period. This Analytics is the basis for calculating hourly wages. To view the results of the work reflected through this dimension, it is possible in standard report [[Report: time tracking]]
https://s.pfx.so/pf/Vl/eaSgOs.jpg
 


In the standard [[Time-Tracking: Working & Leisure Time|Time-tracking]] solution, this data tag is used to calculate hourly wages. It can also compare planned versus actual work time in hourly tracking.
== Useful ==
== Useful ==
* New accounts to work with Analytics "Actual working time" need to install the configuration of the [[Time tracking]]
* New accounts to work with Analytics "Actual working time" need to install the configuration of the [[Time tracking]]

Revision as of 12:48, 30 January 2025

Planfix offers multiple ways to track time, including options that do not require data tags. The system includes standard time-tracking data tags, a widely used time-tracking approach. However, their use is not mandatory.

The data tag group "Time management" contains two types of data tags:


The Planned work time data tag is available by default in every Planfix account and stores information about the date and time range scheduled for a task. It includes the following fields:

pnOktf.jpg

Standard use of this data tag:

  • In Planner lists of the Hourly calendar type, the Planned work time data tag is displayed as a calendar booking block for the specified employee during the defined period.
  • Panfix automatically adds the Planned work time data tag to tasks for which you have specified an employee and set a start time and a due date (within the same day). It then displays these tasks in Planfix’s standard hourly calendars.
  • In addition to the system functions, this data tag can be used in reports to compare the planned time with the actual time spent on a task.

The Actual working time data tag is usually attached to a task by an employee who creates an action that describes the work performed. It contains information about the date, the period, and the type of work performed during this period:

eaSgOs.jpg

In the standard Time-tracking solution, this data tag is used to calculate hourly wages. It can also compare planned versus actual work time in hourly tracking.

Useful

  • New accounts to work with Analytics "Actual working time" need to install the configuration of the Time tracking


Go To