Pyramid chart: Difference between revisions

From Planfix
Jump to: navigation, search
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:


To ensure the correct data is displayed, you must configure grouping and sorting options.
To ensure the correct data is displayed, you must configure grouping and sorting options.
== How to Set It Up ==
== Set up ==
*In the "Report view", add the columns that contain the data you want to visualize in the pyramid.
*In the "Report view", add the columns that contain the data you want to visualize in the pyramid.
*Go to the "Charts and graphs" section and add a new chart of type "Pyramid":
*Go to the "Charts and graphs" section and add a new chart of type "Pyramid":
Line 33: Line 33:


*Save the chart and run the report to view the results.
*Save the chart and run the report to view the results.
==Use Case Examples==
==Use Case Examples==
*Reasons for customer loss.
*Reasons for customer loss.
Line 39: Line 40:


https://s.pfx.so/pf/5x/NDfxcd.jpg
https://s.pfx.so/pf/5x/NDfxcd.jpg
*Tasks completed by counterparties.


https://s.pfx.so/pf/tR/zlfPWQ.jpg
https://s.pfx.so/pf/tR/zlfPWQ.jpg


https://s.pfx.so/pf/6H/QVZbCh.jpg
https://s.pfx.so/pf/6H/QVZbCh.jpg
*Workload by broject.


https://s.pfx.so/pf/iK/LUFCGk.jpg
https://s.pfx.so/pf/iK/LUFCGk.jpg

Latest revision as of 13:00, 16 April 2025

A Pyramid is a chart type available in Planfix reports. It visualizes hierarchical data in the shape of a triangle. The width of each level represents the value of one category in relation to the others.

For example, you can use a pyramid to visualize the distribution of completed tasks across projects over a month:

12Jp6D.jpg

The pyramid is constructed from report data and has several levels. Each level corresponds to a specific category and displays its numerical value.

To ensure the correct data is displayed, you must configure grouping and sorting options.

Set up

  • In the "Report view", add the columns that contain the data you want to visualize in the pyramid.
  • Go to the "Charts and graphs" section and add a new chart of type "Pyramid":

0EjCUC.jpg

  • Enter the following in the Data to be display section:
    • Columns for the chart structure: "Completed tasks"
    • Grouping: Group by the "Projects" column in ascending order
    • Sorting: Sort by the "Completed tasks" column, by month, in ascending order

YP46GI.jpg

  • In the "View" section, you can customize:
    • Chart Height: Set the pixel height for the chart display:

GJ078T.jpg

  • Save the chart and run the report to view the results.

Use Case Examples

  • Reasons for customer loss.

ngvTFQ.jpg

NDfxcd.jpg

  • Tasks completed by counterparties.

zlfPWQ.jpg

QVZbCh.jpg

  • Workload by broject.

LUFCGk.jpg

ljumMC.jpg