Parent tasks

From Planfix
Revision as of 09:01, 9 January 2024 by Dmitri (talk | contribs) (→‎Go To)
Jump to: navigation, search

Planfix supports nested tasks. Any existing task can be made a parent task of another task. You can assign or change the parent task of an existing task in several ways:

  • in task editing mode:

K5KljT.jpg

  • in the "Details" tab of the task:

ttecvS.jpg

Please note

When manually assigning a parent task, the following rule applies: the parent task and the subtask must be in the same project. If the task in the project that is to be set as a parent task is in the inactive status, you need to switch to the "Active" task display mode as shown:

iszZ9S.jpg

B43RFb.jpg


Go To