Chart display features and settings: Difference between revisions

From Planfix
Jump to: navigation, search
 
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
==Setting a chart display period==
The display period of a [[Gantt charts and connections between tasks | Gantt chart]] can be set using the calenders located at the sides of the chart:
https://pic.planfix.ru/pf/xW/mQrKXZ.png
You can move between the endpoints of the time period using the gray slider or by selecting a field in the diagram with the left mouse button.
==Setting the display scope==
There are two ways to change the chart's display scope:
*Select the desired range (hours/days/weeks/months) in the menu
https://pic.planfix.ru/pf/TT/v0CeFv.png
*Clicking the gray slider and dragging it from side to side
https://pic.planfix.ru/pf/bd/EEdxqT.gif
==Going to a specific day in the chart==
When you click the Date button, a calendar opens where you can choose a specific day that you would like to see in the chart:
https://pic.planfix.ru/pf/QV/sLMstQ.png
You can always get back to the current day by clicking '''Today''':
https://pic.planfix.ru/pf/GX/lgGAbY.png
==Collapsing subtasks in the chart==
Tasks shown in a Gantt chart may contain subtasks, which will also be shown
https://pic.planfix.ru/pf/Zq/IDf1es.png
If you want to exclude subtasks from the chart, you need to collapse them in their parent task in the left-hand panel:
https://pic.planfix.ru/pf/og/bCyXaA.gif
As needed, you can use the Display menu to add additional information (such as assignee, task name, or project) to be displayed in the chart, or you can remove information to reduce clutter:
https://pic.planfix.ru/pf/qJ/720zQi.png
==Different backgrounds in Gantt chart items==
If the same task is assigned to multiple employees (that is, if a task has multiple assignees) then in the Gantt chart display of the task filter with grouping by the employee, the task will be shown with hatching lines in the background:
https://pic.planfix.ru/pf/MV/mmtGBh.png
===Important===
The task color in the chart is determined by the [[What does a task's color mean? | color of its status]].
== Go To ==
== Go To ==
*[[Gantt charts and connections between tasks]]
*[[Gantt charts and connections between tasks]]
*[[Tasks]]
*[[Tasks]]
*[[Feature Description]]
*[[Feature Description]]

Latest revision as of 23:25, 24 July 2020

Setting a chart display period

The display period of a Gantt chart can be set using the calenders located at the sides of the chart:


mQrKXZ.png


You can move between the endpoints of the time period using the gray slider or by selecting a field in the diagram with the left mouse button.


Setting the display scope

There are two ways to change the chart's display scope:

  • Select the desired range (hours/days/weeks/months) in the menu


v0CeFv.png


  • Clicking the gray slider and dragging it from side to side


EEdxqT.gif


Going to a specific day in the chart

When you click the Date button, a calendar opens where you can choose a specific day that you would like to see in the chart:


sLMstQ.png


You can always get back to the current day by clicking Today:


lgGAbY.png


Collapsing subtasks in the chart

Tasks shown in a Gantt chart may contain subtasks, which will also be shown


IDf1es.png


If you want to exclude subtasks from the chart, you need to collapse them in their parent task in the left-hand panel:


bCyXaA.gif


As needed, you can use the Display menu to add additional information (such as assignee, task name, or project) to be displayed in the chart, or you can remove information to reduce clutter:


720zQi.png


Different backgrounds in Gantt chart items

If the same task is assigned to multiple employees (that is, if a task has multiple assignees) then in the Gantt chart display of the task filter with grouping by the employee, the task will be shown with hatching lines in the background:


mmtGBh.png


Important

The task color in the chart is determined by the color of its status.