Simple planner list: Difference between revisions

From Planfix
Jump to: navigation, search
 
(2 intermediate revisions by the same user not shown)
Line 20: Line 20:


== How to create a simple list ==
== How to create a simple list ==
*Create a Planner for Kanban::
*Create a Planner for Kanban:


https://s.pfx.so/pf/9P/7ANt9t.jpg
https://s.pfx.so/pf/1h/v0qFHY.jpg


*Add a list::
*Add a list::


https://s.pfx.so/pf/PI/UJ4JUs.jpg
https://s.pfx.so/pf/YG/1iUVYX.jpg
 


*Add ideas or tasks to the list that need to be done:
*Add ideas or tasks to the list that need to be done:


https://s.pfx.so/pf/al/iN1Qdf.gif
https://s.pfx.so/pf/fT/31c0W0.gif


== How to work with simple lists ==
== How to work with simple lists ==
Line 39: Line 38:
*Move the tasks to a [[List (Planner)|standard list]] to assign them for work.  
*Move the tasks to a [[List (Planner)|standard list]] to assign them for work.  


https://s.pfx.so/pf/xU/yyyfYv.gif
https://s.pfx.so/pf/vA/QvU7SL.gif


The task adopts the specified attributes of the list to which it was moved.
The task adopts the specified attributes of the list to which it was moved.


== Go To ==
== Go To ==
*[[Types of planner lists]]
*[[Types of planner lists]]
*[[Planner]]
*[[Planner]]

Latest revision as of 09:35, 24 October 2025

A simple list in the Planner is a type of list intended for quickly recording tasks, notes, ideas, or activities that are not tied to anything specific.

Navigation

The difference between a simple list and a list with conditions

The main difference from standard lists in the planner is the lack of conditional filters. The toggle switch is inactive:

DKmPER.jpg

Standard lists (with conditional filters enabled) are a tool for more deliberate task management in Planfix:

Bp39sv.jpg

How to create a simple list

  • Create a Planner for Kanban:

v0qFHY.jpg

  • Add a list::

1iUVYX.jpg

  • Add ideas or tasks to the list that need to be done:

31c0W0.gif

How to work with simple lists

The working algorithm is as follows:

  • Add tasks to the simple list.
  • Plan who will complete these tasks, when, and in what order.
  • Move the tasks to a standard list to assign them for work.

QvU7SL.gif

The task adopts the specified attributes of the list to which it was moved.

Go To