Task (Field type): Difference between revisions
From Planfix
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
This type of field is used to store a link to one task. Example of a Task field: | This type of field is used to store a link to one task. | ||
Example of a Task field: | |||
Revision as of 20:35, 22 June 2019
This type of field is used to store a link to one task.
Example of a Task field:
Field options:
● No duplication - you can't save a directory entry if there already exists a field with the same value in the directory