Milestones: Difference between revisions
From Planfix
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
*In [[Gantt charts and connections between tasks | Gantt charts]], milestones are indicated with diamond shapes: | *In [[Gantt charts and connections between tasks | Gantt charts]], milestones are indicated with diamond shapes: | ||
https:// | https://s.pfx.so/pf/wE/pJfh1R.jpg | ||
You can convert a task into a milestone in two ways: | You can convert a task into a milestone in two ways: | ||
*Via the drop-down menu in Gantt chart mode: | *Via the drop-down menu in Gantt chart mode: | ||
*By setting the 'Duration' field of the task to zero: | https://s.pfx.so/pf/JR/lTUtbe.jpg | ||
*By setting the '''Duration''' field of the task to zero: | |||
https://s.pfx.so/pf/Hh/W7uPzT.jpg | |||
Latest revision as of 11:59, 18 October 2024
In project management, a milestone is a checkpoint or significant point (for example, moving forward to a new stage when working on a project, or signing important documents). There are usually crucial events associated with milestones, which are stipulated in the project plan.
- In Planfix, any task with a duration set to 0 is considered a milestone.
- In Gantt charts, milestones are indicated with diamond shapes:
You can convert a task into a milestone in two ways:
- Via the drop-down menu in Gantt chart mode:
- By setting the Duration field of the task to zero: