Milestones: Difference between revisions

From Planfix
Jump to: navigation, search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 10: Line 10:
*In [[Gantt charts and connections between tasks | Gantt charts]], milestones are indicated with diamond shapes:
*In [[Gantt charts and connections between tasks | Gantt charts]], milestones are indicated with diamond shapes:


https://pic.planfix.ru/pf/mP/P9Xr70.png
https://s.pfx.so/pf/wE/pJfh1R.jpg


You can convert a task into a milestone in two ways:
You can convert a task into a milestone in two ways:
*Via the drop-down menu in Gantt chart mode:
*Via the drop-down menu in Gantt chart mode:


*By setting the 'Duration' field of the task to zero:
https://s.pfx.so/pf/JR/lTUtbe.jpg
 
*By setting the '''Duration''' field of the task to zero:
 
https://s.pfx.so/pf/Hh/W7uPzT.jpg





Latest revision as of 11:59, 18 October 2024

In project management, a milestone is a checkpoint or significant point (for example, moving forward to a new stage when working on a project, or signing important documents). There are usually crucial events associated with milestones, which are stipulated in the project plan.

  • In Planfix, any task with a duration set to 0 is considered a milestone.
  • In Gantt charts, milestones are indicated with diamond shapes:

pJfh1R.jpg

You can convert a task into a milestone in two ways:

  • Via the drop-down menu in Gantt chart mode:

lTUtbe.jpg

  • By setting the Duration field of the task to zero:

W7uPzT.jpg


Go To