Tasks without mandatory result checking: Difference between revisions
From Planfix
No edit summary |
No edit summary |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{#seo: | |||
|title=Tasks without mandatory result checking | |||
|titlemode=append | |||
|keywords=planfix, task, result checking | |||
|description= task result checking | |||
}} | |||
Some tasks do not need to be monitored. Examples of such tasks are reminder tasks or tasks someone assigns to themselves. | Some tasks do not need to be monitored. Examples of such tasks are reminder tasks or tasks someone assigns to themselves. | ||
For these tasks, the attribute '''Task without mandatory result checking''' can be set. Then, the assignee themselves will be able to change the task status to Complete. | For these tasks, the attribute '''Task without mandatory result checking''' can be set. Then, the assignee themselves will be able to change the task status to '''Complete'''. | ||
https://pic.planfix.ru/pf/pO/OCr4Ax.png | https://pic.planfix.ru/pf/pO/OCr4Ax.png | ||
If this attribute is not set, the task status will change to Complete according to the settings of the corresponding status set. | If this attribute is not set, the task status will change to '''Complete''' according to the settings of the corresponding [[Creating a status set|status set]]. | ||
== Go To == | == Go To == | ||
*[[Tasks]] | *[[Tasks]] | ||
*[[Feature Description]] |
Latest revision as of 13:24, 24 June 2024
Some tasks do not need to be monitored. Examples of such tasks are reminder tasks or tasks someone assigns to themselves.
For these tasks, the attribute Task without mandatory result checking can be set. Then, the assignee themselves will be able to change the task status to Complete.
If this attribute is not set, the task status will change to Complete according to the settings of the corresponding status set.