Milestones: Difference between revisions
From Planfix
No edit summary |
No edit summary |
||
(7 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{#seo: | |||
|title=Milestones | |||
|titlemode=append | |||
|keywords=planfix, Milestones, tasks, Gantt charts | |||
|description=Вехи | |||
}} | |||
In project management, a '''milestone''' is a checkpoint or significant point (for example, moving forward to a new stage when working on a project, or signing important documents). There are usually crucial events associated with milestones, which are stipulated in the project plan. | |||
*In Planfix, any task with a duration set to 0 is considered a milestone. | |||
*In [[Gantt charts and connections between tasks | Gantt charts]], milestones are indicated with diamond shapes: | |||
https://s.pfx.so/pf/wE/pJfh1R.jpg | |||
You can convert a task into a milestone in two ways: | |||
*Via the drop-down menu in Gantt chart mode: | |||
https:// | https://s.pfx.so/pf/JR/lTUtbe.jpg | ||
*By setting the '''Duration''' field of the task to zero: | |||
== Go | https://s.pfx.so/pf/Hh/W7uPzT.jpg | ||
*[[Gantt | |||
== Go To == | |||
*[[Gantt charts and connections between tasks]] | |||
*[[Tasks]] | *[[Tasks]] | ||
*[[Feature Description]] |
Latest revision as of 11:59, 18 October 2024
In project management, a milestone is a checkpoint or significant point (for example, moving forward to a new stage when working on a project, or signing important documents). There are usually crucial events associated with milestones, which are stipulated in the project plan.
- In Planfix, any task with a duration set to 0 is considered a milestone.
- In Gantt charts, milestones are indicated with diamond shapes:
You can convert a task into a milestone in two ways:
- Via the drop-down menu in Gantt chart mode:
- By setting the Duration field of the task to zero: