{"id":14398,"date":"2025-01-28T10:00:00","date_gmt":"2025-01-28T09:00:00","guid":{"rendered":"https:\/\/planfix.com\/blog\/?p=14398"},"modified":"2026-10-07T02:43:57","modified_gmt":"2026-10-07T00:43:57","slug":"planner-list-totals","status":"publish","type":"post","link":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/","title":{"rendered":"How to Show Task Counts and Totals in a Planfix Planner"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Task counts and totals in a Planfix planner do not need a separate report: a planner list can count its own cards and add up a field while you work. The <a href=\"https:\/\/planfix.com\/help\/Totals_in_Planners\">totals section in Planner lists<\/a> calculates the number of tasks or contacts in a list, or the sum of a field for every object in it, and shows the result under the list heading. This two-minute video builds that setup in a sales funnel, from a lead counter to a payment total that turns green when the target is reached.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Task Summaries in Planfix Lists | Step-by-step Guides\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/-ZnWXODsOBQ?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What you\u2019ll learn: live totals in a sales funnel planner<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>See the funnel example: counted leads, summed profit and summed losses in three lists (0:10).<\/li>\n\n\n\n<li>Turn on the totals section in a list and count the tasks inside it (0:42).<\/li>\n\n\n\n<li>Restrict dragging so a list accepts no more than ten leads (0:55).<\/li>\n\n\n\n<li>Sum the values of a field, such as the payment amount, and label the result (1:10).<\/li>\n\n\n\n<li>Turn a list heading green once the payment target is reached.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">How to set up list totals in Planfix, step by step<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Step 1. Turn on the totals section<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Open the settings of the list you want to count and scroll to the very bottom, where the <strong>Show totals section<\/strong> setting sits. Task and contact lists in a <a href=\"https:\/\/planfix.com\/features\/planner\/\">planner in Planfix<\/a> have this setting, so you can repeat the setup for each column of a funnel. Once totals are on, choose the total type: the number of objects in the list, or the sum of a field.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 2. Count the tasks in a list<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For a counter, pick the total type that counts objects, then enter the text displayed before and after the value, for example \u201cNew leads\u201d in front of the number. Planfix counts the tasks or contacts that match the list\u2019s selection parameters and displays the figure below the list heading, where it changes as cards arrive and leave. In the video, the <strong>New<\/strong> list counts incoming leads this way, with no report and no manual recount.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 3. Sum the values of a field<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">To total money instead of cards, open the totals section of the <strong>Paid<\/strong> list, select <strong>Sum<\/strong> as the total type and specify the field the sum is calculated from. That field is preconfigured at the object card level, so the list only reads a value each card already carries. Add the text shown before and after the value, then repeat the same configuration for the <strong>Lost<\/strong> list to see total losses.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 4. Add a limit and color the heading<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>Limit<\/strong> function lives in the same totals section. Activate it, define the trigger and the conditions, and select the color the block turns when the condition is met. The video uses it twice: in the <strong>In progress<\/strong> list, a limit of ten leads together with blocking new tasks from being dragged and dropped into the list, so an eleventh card cannot be added by hand; in the <strong>Paid<\/strong> list, the same function turns the heading green once the payment target is reached.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Example: lead counts, profit and losses in one sales funnel<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The funnel in the video handles leads for Spanish language courses. The <strong>New<\/strong> list counts incoming leads automatically, the <strong>Paid<\/strong> list summarizes the total profit from paid leads, and the <strong>Lost<\/strong> list displays the total losses, so the pipeline reports itself on one screen. A second planner shows the same funnel for employees with two adjustments: the <strong>In progress<\/strong> list takes no more than ten leads, and the <strong>Paid<\/strong> heading turns green at the payment target. Because every list carries its own total, the board reads like a <a href=\"https:\/\/planfix.com\/crm\/\">CRM dashboard<\/a>: how many leads arrived, how much was earned and how much was lost.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Who it\u2019s for<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Sales teams:<\/strong> a lead count on every funnel stage and a cap on how many deals one stage accepts.<\/li>\n\n\n\n<li><strong>Finance and management:<\/strong> profit and losses summed straight from the board, without a manual recount.<\/li>\n\n\n\n<li><strong>Team leads:<\/strong> a cap on work in progress that blocks dragging once a list is full.<\/li>\n\n\n\n<li><strong>Support and operations:<\/strong> a live count of open requests under each list heading.<\/li>\n\n\n\n<li><strong>Project teams:<\/strong> the sum of a numeric field, such as hours or amounts, per list instead of per task.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ<\/h2>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq\" id=\"aioseo-can-a-planner-list-count-tasks-automatically\"><h3 class=\"aioseo-faq-block-question\"><strong>Can a planner list count tasks automatically?<\/strong><\/h3><div class=\"aioseo-faq-block-answer\">\n<p class=\"wp-block-paragraph\">Yes. Turn on <strong>Show totals section<\/strong> at the very bottom of the list\u2019s settings and choose the total type that counts objects. The number of tasks or contacts appears below the list heading and changes as cards move in and out.<\/p>\n<\/div><\/div>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq\" id=\"aioseo-can-a-planner-list-add-up-a-payment-field\"><h3 class=\"aioseo-faq-block-question\"><strong>Can a planner list add up a payment field?<\/strong><\/h3><div class=\"aioseo-faq-block-answer\">\n<p class=\"wp-block-paragraph\">Yes. Select <strong>Sum<\/strong> as the total type and specify the field the sum is calculated from; the total covers every object in the list. The field itself is preconfigured at the object card level, and you can add your own text before and after the value.<\/p>\n<\/div><\/div>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq\" id=\"aioseo-can-i-stop-tasks-from-being-dragged-into-a-full-list\"><h3 class=\"aioseo-faq-block-question\"><strong>Can I stop tasks from being dragged into a full list?<\/strong><\/h3><div class=\"aioseo-faq-block-answer\">\n<p class=\"wp-block-paragraph\">Yes. Activate the <strong>Limit<\/strong> function in the totals section, define the trigger and the color, and block new tasks from being dragged and dropped into the list. In the video, the <strong>In progress<\/strong> list stops accepting leads after ten.<\/p>\n<\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Start with one list<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Pick the single list you keep counting by hand, whether it holds new leads, paid deals or open requests, and give it a total. When you need history and figures across projects rather than a live number on a board, <a href=\"https:\/\/planfix.com\/features\/reports\/\">Planfix reports<\/a> take over from the list total. For another planner built on the same setting, see how to <a href=\"https:\/\/planfix.com\/blog\/video\/planner-managing-overdue-tasks-in-planfix\/\">track overdue tasks in a planner<\/a>. New to Planfix? <a href=\"https:\/\/planfix.com\/signup\/\">Sign up<\/a> to try it.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.<\/p>\n","protected":false},"author":146,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_s2mail":"","footnotes":""},"categories":[498],"tags":[164,518],"class_list":["post-14398","post","type-post","status-publish","format-standard","hentry","category-video","tag-planner","tag-sales-pipeline"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.\" \/>\n\t<meta name=\"robots\" content=\"max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n\t<meta name=\"author\" content=\"Content Factory\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Planfix | Planfix Blog\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"How to Show Task Counts and Totals in a Planfix Planner | Planfix\" \/>\n\t\t<meta property=\"og:description\" content=\"2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-01-28T09:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-07T00:43:57+00:00\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/i.ytimg.com\/vi\/-ZnWXODsOBQ\/maxresdefault.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/i.ytimg.com\/vi\/-ZnWXODsOBQ\/maxresdefault.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"How to Show Task Counts and Totals in a Planfix Planner | Planfix\" \/>\n\t\t<meta name=\"twitter:description\" content=\"2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/i.ytimg.com\/vi\/-ZnWXODsOBQ\/maxresdefault.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#blogposting\",\"name\":\"How to Show Task Counts and Totals in a Planfix Planner | Planfix\",\"headline\":\"How to Show Task Counts and Totals in a Planfix Planner\",\"author\":{\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/author\\\/content-factory\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/#organization\"},\"datePublished\":\"2025-01-28T10:00:00+01:00\",\"dateModified\":\"2026-10-07T02:43:57+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#webpage\"},\"articleSection\":\"Video, Planners, filters & search, Sales pipeline & leads\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/planfix.com\\\/blog\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/category\\\/video\\\/#listItem\",\"name\":\"Video\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/category\\\/video\\\/#listItem\",\"position\":2,\"name\":\"Video\",\"item\":\"https:\\\/\\\/planfix.com\\\/blog\\\/category\\\/video\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#listItem\",\"name\":\"How to Show Task Counts and Totals in a Planfix Planner\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#listItem\",\"position\":3,\"name\":\"How to Show Task Counts and Totals in a Planfix Planner\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/category\\\/video\\\/#listItem\",\"name\":\"Video\"}}]},{\"@type\":\"FAQPage\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#faq\",\"url\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Can a planner list count tasks automatically?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. Turn on Show totals section at the very bottom of the list\\u2019s settings and choose the total type that counts objects. The number of tasks or contacts appears below the list heading and changes as cards move in and out.\"}},{\"@type\":\"Question\",\"name\":\"Can a planner list add up a payment field?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. Select Sum as the total type and specify the field the sum is calculated from; the total covers every object in the list. The field itself is preconfigured at the object card level, and you can add your own text before and after the value.\"}},{\"@type\":\"Question\",\"name\":\"Can I stop tasks from being dragged into a full list?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. Activate the Limit function in the totals section, define the trigger and the color, and block new tasks from being dragged and dropped into the list. In the video, the In progress list stops accepting leads after ten.\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/#organization\",\"name\":\"Planfix Inc.\",\"description\":\"Planfix Blog\",\"url\":\"https:\\\/\\\/planfix.com\\\/blog\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/author\\\/content-factory\\\/#author\",\"url\":\"https:\\\/\\\/planfix.com\\\/blog\\\/author\\\/content-factory\\\/\",\"name\":\"Content Factory\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a1857a91e10ab76b6cffe9d708d39532e262047b15cb27b016ad165e9ac19c7e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Content Factory\"}},{\"@type\":\"VideoObject\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#video\",\"name\":\"How to Show Task Counts and Totals in a Planfix Planner\",\"description\":\"2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.\",\"thumbnailUrl\":\"https:\\\/\\\/i.ytimg.com\\\/vi\\\/-ZnWXODsOBQ\\\/maxresdefault.jpg\",\"uploadDate\":\"2025-01-28T10:00:00+01:00\",\"embedUrl\":\"https:\\\/\\\/www.youtube.com\\\/embed\\\/-ZnWXODsOBQ\",\"url\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#webpage\",\"url\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/\",\"name\":\"How to Show Task Counts and Totals in a Planfix Planner | Planfix\",\"description\":\"2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/video\\\/planner-list-totals\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/author\\\/content-factory\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/author\\\/content-factory\\\/#author\"},\"datePublished\":\"2025-01-28T10:00:00+01:00\",\"dateModified\":\"2026-10-07T02:43:57+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/planfix.com\\\/blog\\\/\",\"name\":\"Planfix Blog\",\"description\":\"Planfix Blog\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/planfix.com\\\/blog\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>How to Show Task Counts and Totals in a Planfix Planner | Planfix<\/title>\n\n","aioseo_head_json":{"title":"How to Show Task Counts and Totals in a Planfix Planner | Planfix","description":"2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.","canonical_url":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/","robots":"max-snippet:-1, max-image-preview:large, max-video-preview:-1","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#blogposting","name":"How to Show Task Counts and Totals in a Planfix Planner | Planfix","headline":"How to Show Task Counts and Totals in a Planfix Planner","author":{"@id":"https:\/\/planfix.com\/blog\/author\/content-factory\/#author"},"publisher":{"@id":"https:\/\/planfix.com\/blog\/#organization"},"datePublished":"2025-01-28T10:00:00+01:00","dateModified":"2026-10-07T02:43:57+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#webpage"},"isPartOf":{"@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#webpage"},"articleSection":"Video, Planners, filters & search, Sales pipeline & leads"},{"@type":"BreadcrumbList","@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/planfix.com\/blog#listItem","position":1,"name":"Home","item":"https:\/\/planfix.com\/blog","nextItem":{"@type":"ListItem","@id":"https:\/\/planfix.com\/blog\/category\/video\/#listItem","name":"Video"}},{"@type":"ListItem","@id":"https:\/\/planfix.com\/blog\/category\/video\/#listItem","position":2,"name":"Video","item":"https:\/\/planfix.com\/blog\/category\/video\/","nextItem":{"@type":"ListItem","@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#listItem","name":"How to Show Task Counts and Totals in a Planfix Planner"},"previousItem":{"@type":"ListItem","@id":"https:\/\/planfix.com\/blog#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#listItem","position":3,"name":"How to Show Task Counts and Totals in a Planfix Planner","previousItem":{"@type":"ListItem","@id":"https:\/\/planfix.com\/blog\/category\/video\/#listItem","name":"Video"}}]},{"@type":"FAQPage","@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#faq","url":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/","mainEntity":[{"@type":"Question","name":"Can a planner list count tasks automatically?","acceptedAnswer":{"@type":"Answer","text":"Yes. Turn on Show totals section at the very bottom of the list\u2019s settings and choose the total type that counts objects. The number of tasks or contacts appears below the list heading and changes as cards move in and out."}},{"@type":"Question","name":"Can a planner list add up a payment field?","acceptedAnswer":{"@type":"Answer","text":"Yes. Select Sum as the total type and specify the field the sum is calculated from; the total covers every object in the list. The field itself is preconfigured at the object card level, and you can add your own text before and after the value."}},{"@type":"Question","name":"Can I stop tasks from being dragged into a full list?","acceptedAnswer":{"@type":"Answer","text":"Yes. Activate the Limit function in the totals section, define the trigger and the color, and block new tasks from being dragged and dropped into the list. In the video, the In progress list stops accepting leads after ten."}}]},{"@type":"Organization","@id":"https:\/\/planfix.com\/blog\/#organization","name":"Planfix Inc.","description":"Planfix Blog","url":"https:\/\/planfix.com\/blog\/"},{"@type":"Person","@id":"https:\/\/planfix.com\/blog\/author\/content-factory\/#author","url":"https:\/\/planfix.com\/blog\/author\/content-factory\/","name":"Content Factory","image":{"@type":"ImageObject","@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/a1857a91e10ab76b6cffe9d708d39532e262047b15cb27b016ad165e9ac19c7e?s=96&d=mm&r=g","width":96,"height":96,"caption":"Content Factory"}},{"@type":"VideoObject","@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#video","name":"How to Show Task Counts and Totals in a Planfix Planner","description":"2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.","thumbnailUrl":"https:\/\/i.ytimg.com\/vi\/-ZnWXODsOBQ\/maxresdefault.jpg","uploadDate":"2025-01-28T10:00:00+01:00","embedUrl":"https:\/\/www.youtube.com\/embed\/-ZnWXODsOBQ","url":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/"},{"@type":"WebPage","@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#webpage","url":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/","name":"How to Show Task Counts and Totals in a Planfix Planner | Planfix","description":"2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/planfix.com\/blog\/#website"},"breadcrumb":{"@id":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/#breadcrumblist"},"author":{"@id":"https:\/\/planfix.com\/blog\/author\/content-factory\/#author"},"creator":{"@id":"https:\/\/planfix.com\/blog\/author\/content-factory\/#author"},"datePublished":"2025-01-28T10:00:00+01:00","dateModified":"2026-10-07T02:43:57+02:00"},{"@type":"WebSite","@id":"https:\/\/planfix.com\/blog\/#website","url":"https:\/\/planfix.com\/blog\/","name":"Planfix Blog","description":"Planfix Blog","inLanguage":"en-US","publisher":{"@id":"https:\/\/planfix.com\/blog\/#organization"}}]},"og:locale":"en_US","og:site_name":"Planfix | Planfix Blog","og:type":"article","og:title":"How to Show Task Counts and Totals in a Planfix Planner | Planfix","og:description":"2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.","og:url":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/","article:published_time":"2025-01-28T09:00:00+00:00","article:modified_time":"2026-10-07T00:43:57+00:00","og:image":"https:\/\/i.ytimg.com\/vi\/-ZnWXODsOBQ\/maxresdefault.jpg","og:image:secure_url":"https:\/\/i.ytimg.com\/vi\/-ZnWXODsOBQ\/maxresdefault.jpg","og:image:width":1280,"og:image:height":720,"twitter:card":"summary_large_image","twitter:title":"How to Show Task Counts and Totals in a Planfix Planner | Planfix","twitter:description":"2-minute video and steps: show task counts and totals in a Planfix planner list, sum a field for paid deals and cap how many cards a list accepts.","twitter:image":"https:\/\/i.ytimg.com\/vi\/-ZnWXODsOBQ\/maxresdefault.jpg"},"aioseo_meta_data":{"post_id":"14398","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"open_ai":null,"created":"2026-10-06 08:19:56","updated":"2026-10-08 08:06:48","ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":"2026-10-07 01:00:19"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/planfix.com\/blog\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/planfix.com\/blog\/category\/video\/\" title=\"Video\">Video<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tHow to Show Task Counts and Totals in a Planfix Planner\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/planfix.com\/blog"},{"label":"Video","link":"https:\/\/planfix.com\/blog\/category\/video\/"},{"label":"How to Show Task Counts and Totals in a Planfix Planner","link":"https:\/\/planfix.com\/blog\/video\/planner-list-totals\/"}],"_links":{"self":[{"href":"https:\/\/planfix.com\/blog\/wp-json\/wp\/v2\/posts\/14398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/planfix.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/planfix.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/planfix.com\/blog\/wp-json\/wp\/v2\/users\/146"}],"replies":[{"embeddable":true,"href":"https:\/\/planfix.com\/blog\/wp-json\/wp\/v2\/comments?post=14398"}],"version-history":[{"count":2,"href":"https:\/\/planfix.com\/blog\/wp-json\/wp\/v2\/posts\/14398\/revisions"}],"predecessor-version":[{"id":14522,"href":"https:\/\/planfix.com\/blog\/wp-json\/wp\/v2\/posts\/14398\/revisions\/14522"}],"wp:attachment":[{"href":"https:\/\/planfix.com\/blog\/wp-json\/wp\/v2\/media?parent=14398"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/planfix.com\/blog\/wp-json\/wp\/v2\/categories?post=14398"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/planfix.com\/blog\/wp-json\/wp\/v2\/tags?post=14398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}