Time management

From Planfix
Revision as of 09:42, 14 November 2017 by Alice (talk | contribs) (Created page with "<pre> The translation of this page is done using machine translation technology. We apologize for any inaccuracies and errors. </pre> Analytics group "Time Management" conta...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
The translation of this page is done using machine translation technology. 
We apologize for any inaccuracies and errors.

Analytics group "Time Management" contains two dimensions:

  • Planned working time
  • Actual working time (for the configuration Time tracking)


Analytics ""'Planned working time"'" is usually attached to the task automatically whenever You are planning to work on it, see the Scheduler. It contains information about the date and time on which the scheduled job. In addition to the system functions for which it was created, this Analytics can also be used in reports to compare planned and actual time spent on the task.


Analyst ""'real"'" is usually attached to the task by the officer who creates an action with a description of the steps taken on the task of work. It contains information about the date, time and type of work that was actually conducted in this period. This dimension is the basis for calculating hourly wages. To view the results of the work reflected through this dimension, it is possible in standard report Report: time tracking


Useful


Go To